schedule 40 cold finished seamless steel alloy pipe T5
Model Number: DB-Alloy Pipe-10
Key Specifications / Features
alloy pipe T5 manufacture in China supplies schedule 40 cold finished seamless steel alloy pipe T5
Contact Supplier
Detail Information
Type:Alloy Steel Pipe
Standard and material:ASTM A213 T5
Size:6m length, schedule 40
Manufacture Method: Cold Drawn
Surface Treatment:Black Painting
Application:Heat exchanger,boiler tube
Third Party Inspection:SGS,BV,INTERNET ECT
Packing:Seaworthy wooden cases/pallet or as your requirement
Payment Terms:TT/LC,West Union,Paypal,O/A
Delivery Time:7-25 days after received the deposit
Standard and material:ASTM A213 T5
Size:6m length, schedule 40
Manufacture Method: Cold Drawn
Surface Treatment:Black Painting
Application:Heat exchanger,boiler tube
Third Party Inspection:SGS,BV,INTERNET ECT
Packing:Seaworthy wooden cases/pallet or as your requirement
Payment Terms:TT/LC,West Union,Paypal,O/A
Delivery Time:7-25 days after received the deposit
Supplier Information
Chengdu Derbo Steel Co.,Ltd
Verified Supplier
Room 3908, Block 1 Park View Plaza, No.530 Tianfu Avenue, Chengdu, China
Est. 1990
Certifications:
ISO 9001
de***********02
3764 article(s)
Comments
Leave a Comment