Detail Information
Type:Casing pipe
Manufacture Method:Hot Rolled
Standard and material: API 5CT K55
Size: 4 1/4 inch R2
Surface Treatment:Black Painting/sand blast or as your requirement
Independence Inspection:Chemical Test,Mechanical Test
Third Party Inspection:SGS,BV,INTERNET ECT
Application:Oil&gas pipe line
Payment Terms:TT/LC,West Union,Paypal,O/A
Delivery Time:7-25 days after received the deposit
Manufacture Method:Hot Rolled
Standard and material: API 5CT K55
Size: 4 1/4 inch R2
Surface Treatment:Black Painting/sand blast or as your requirement
Independence Inspection:Chemical Test,Mechanical Test
Third Party Inspection:SGS,BV,INTERNET ECT
Application:Oil&gas pipe line
Payment Terms:TT/LC,West Union,Paypal,O/A
Delivery Time:7-25 days after received the deposit
| Grade | Chemical Composition | ||||||||||||
| C | Mn | Mo | Cr | Ni | Cu | P | S | Si | |||||
| Min | Max | Min | Max | Min | Max | Min | Max | Max | Max | Max | Max | Max | |
| K55 | - | - | - | - | - | - | - | - | - | - | 0.03 | 0.03 | - |
| Grade | Yield Strength | Tensile Strenth | Hardness | Allowable Hardness Variation | |||||
| Min | Max | Min | Max | ||||||
| Psi | Mpa | Psi | Mpa | Psi | Mpa | HRC | BHN | hrc | |
| K55 | 55000 | 379 | 80000 | 552 | 95000 | 655 | - | - | - |
Supplier Information
Chengdu Derbo Steel Co.,Ltd
Verified Supplier
Room 3908, Block 1 Park View Plaza, No.530 Tianfu Avenue, Chengdu, China
Est. 1990
Certifications:
ISO 9001
de***********02
3780 article(s)
Comments
Leave a Comment